She looked straight at me and said I was hiding something beneath those panels.
For a moment I thought she meant a physical object.
Then she added that people who watched others should expect to be watched themselves.
The sentence sounded like a threat, but it was vague enough that she could deny it later.
I went back inside rather than argue in front of the neighbors.
Allison was standing at the window with her arms folded tightly across her chest.
She asked whether Vivian was trying to make us move.
I said that would be a strange way to buy a house.
Allison reminded me that people did not always want the house itself.
Sometimes they wanted what was underneath it, beside it, or behind it.
I looked again at the old drainage map.
The control access rectangle sat behind Vivian’s fence, but the drainage line crossed the rear corner of our lot before continuing beneath the next property.
The legal description was old and difficult to read, and I knew better than to interpret property rights from a sketch alone.
I called a local land surveyor named Rebecca Hall and asked whether she could review the recorded easement.
She agreed to inspect the public documents before deciding whether a field survey would be useful.
Two days later she called with a question I could not answer.
She wanted to know whether anyone had recently applied to change the drainage line’s use.
I said I had never heard of such an application.
Rebecca told me she had found a preliminary engineering inquiry involving a communications conduit proposed along the same route.
The inquiry did not grant construction rights, and it did not prove that work was happening.
It did, however, suggest that somebody had been studying the corridor for something other than drainage.
She sent me the public reference number and told me to request the full file from the county planning office.
I submitted the request that afternoon.
Three days passed before the county emailed me a packet of drawings and correspondence.
The first pages described an abandoned drainage maintenance corridor.
The later pages proposed a narrow underground fiber connection serving a privately owned equipment shelter beyond the rear boundary of our block.
The proposed route would cross land where the recorded easement appeared to allow only drainage maintenance.
Several pages were stamped PRELIMINARY and NOT APPROVED.
I understood enough to know that no one had a right to dig merely because a consultant had drawn a line on a map.